1. Pool Layout:
We discuss the pool install with the homeowner and finalize the pool layout. Underground lines of utilities like water, power, and gas are marked out

2. Dig Day:
We dig the site and fit a stone bed to add strength and support to the gunite swimming pool

3. Steel Installation:
The structural reinforcement is placed over bricks & the entire dup-up site acts as a skeleton to the pool

4. Plumbing:
For a more energy-efficient pool, we use plumbing lines that are larger than average. Then we add electrical wiring

5. Gunite Shells:
The gunite pool shell is sprayed onto the steel reinforcement

6. Tile & Coping:
We add the perimeter tile, coping over the gunite bond beam, and decking around the pool

7. Equipment:
Pool circulation, heating, and filtration equipment is added to the concrete pool
.jpg)
8. Plaster:
The last step is to apply a waterproof pool interior finish and finalizing the landscape design